H& H is serving as lead designer for the reconstruction of the S-32 Bridge over the Shrewsbury River. The project objective is to construct a parallel structure and redesign a traffic signal at a State Highway.

Existing and future conditions traffic analyses were performed for summer peak and off-peak conditions using Synchro and SimTraffic software. Complex simulations were designed to assess traffic conditions and queuing during bridge openings. Striping designs including pedestrian and bicycle facilities were performed, a traffic signal redesign was completed, and a lighting analysis and design completed for the traffic signal and a nearby park facility.

Services include operational analysis, modeling, pedestrian & bike design, striping and signals.