H&H provided structures design and utility coordination as a subconsultant on the Ranger Construction design-build team. The project included constructing express lanes in the existing median, entrance and exit ramps for the express lanes at various locations, and constructing a bridge over I-75 at Pembroke Road. Work also included reconstructing Miramar Parkway Interchange; installing sound barrier walls; drainage, signage, lighting and landscaping; upgrading traffic monitoring cameras, dynamic message signs and installing toll gantries.

The Miramar Parkway Bridge consists of a total length of 452 ft with a span configuration of 146’-0”, 132’-0”, 91’-0” and 83’-0” for Spans 1,2,3 & 4 respectively. The Miramar Parkway superstructure utilizes 63” FIB Beams in the longer spans. 21 ~ 63” FIB beams were utilized in Span 1 and 15 ~ 63” FIB beams were utilized in Span 2. 63” FIB beams were used for the fascia girders of Spans 3 and 4 to match the superstructure depth of Spans 1 and 2. A new fiber optic signal interconnect cable will be provided to replace an existing cable.

The Pembroke Road Bridge is a structure with total length of 456’-8 3/8” with a span configuration of 170’-5”, 115’-10 3/8” and 170’-5” for Spans 1, 2 & 3 respectively. 15 ~ 72” FIB beams were utilized for Spans 1 & 3. 6 ~ 54” FIB beams were used for the interior beams of Span 2 with 2 ~ 72” fascia beams in Span 2 to match Spans 1 & 3. MSE walls tie into the MSE wall segments constructed by Broward County.

Both the Pembroke Road and Miramar Parkway bridge piers utilize a cast-in-place concrete cap and column concept founded on pre-stressed concrete pile footing.

Our Tampa and Port Charlotte Offices are experiencing intermittent power outages due to the storm. If you need immediate assistance, please call 503.821.6449. Be safe!!!
Hello. Add your message here.