The project is the first completed section of a 10-mile-long flood protection system built around Lower Manhattan in response to Hurricane Sandy. H&H designed both the Delancey Street & E.10th Street Pedestrian Bridges for NYC’s Department of Design and Construction, alongside the AKRF/KSE JV team. The approaches were comprised of concrete cellular ramps which lead up to a 209-foot steel tied-arch bridge spanning the FDR Drive, reconnecting the neighborhood to the waterfront.
The bridges serve as an extension of the park into the community, functioning not only as a practical element but also as a symbolic landmark. This is what made H&H especially excited to design this portion of the project, as it provided an opportunity to think about infrastructure not only as serving a functional purpose but also as creating a meaningful marker within the community.